SECTION
106 CONSTRUCTION DOCUMENTS
106.1
Submittal documents. Construction documents, statement
of special inspections and other data shall be submitted in
one or more sets with each permit application. The construction
documents shall be prepared by a registered design professional
where required by the statutes of the jurisdiction in which
the project is to be constructed. Where special conditions
exist, the building official is authorized to require additional
construction documents to be prepared by a registered design
professional.
Exception: The building official is authorized to waive
the submission of construction documents and other data not
required to be prepared by a registered design professional
if it is found that the nature of the work applied for is
such that review of construction documents is not necessary
to obtain compliance with this code.
106.1.1 Information on construction documents. Construction
documents shall be dimensioned and drawn upon suitable material.
Electronic media documents are permitted to be submitted
when approved by the building official. Construction documents
shall be of sufficient clarity to indicate the location,
nature and extent of the work proposed and show in detail
that it will conform to the provisions of this code and
relevant laws, ordinances, rules and regulations, as determined
by the building official.
106.1.1.1 Fire protection system shop drawings.
Shop drawings for the fire protection system (s) shall
be submitted to indicate conformance with this code and
the construction documents and shall be approved prior
to the start of system installation. Shop drawings shall
contain all information as required by the referenced
installation standards in Chapter 9.
106.1.2 Means of egress. The construction documents
shall show in sufficient detail the location, construction,
size and character of all portions of the means of egress
in compliance with the provisions of this code. In other
than occupancies in Groups R-2, R-3, and I-1, the construction
documents shall designate the number of occupants to be
accommodated on every floor, and in all rooms and spaces.
106.1.3 Exterior wall envelope. Construction documents
for all buildings shall describe the exterior wall envelope
in sufficient detail to determine compliance with this code.
The construction documents shall provide details of the
exterior wall envelope as required, including flashing,
intersections with dissimilar materials, corners, end details,
control joints, intersections at roof, eaves or parapets,
means of drainage, water-resistive membrane and details
around openings. The construction documents shall include
manufacturer's installation instructions that provide supporting
documentation that the proposed penetration and opening
details described in the construction documents maintain
the weather resistance of the exterior wall envelope. The
supporting documentation shall fully describe the exterior
wall system which was tested, where applicable, as well
as the test procedure used.
|
|
|
All
Rights Reserved. This 2006 International Building Code® is a
copyrighted work owned by the International Code Council, Inc. Without
advance written permission from the copyright owner, no part of
this book may be reproduced, distributed, or transmitted in any
form or by any means, including, without limitation, electronic,
optical or mechanical means (by way of example and not limitation,
photocopying, or recording by or in an information storage retrieval
system). For information on permission to copy material exceeding
fair use, please contact: Publications, 4051West Flossmoor Road,
Country Club Hills, IL 60478-5795. Phone 1-888-ICC-SAFE (422-7233).
Trademarks: International Code Council, the International
Code Council logo and the International Building Code
are trademarks of the International Code Council, Inc.
|
|